Leyton Orient Football Club
Tubular Techniques were engaged by First Choice Scaffolding to prepare the scaffolding designs for the East Stand at the historic Leyton Orient Football club to enable the 100year old stand to be refurbished ready for the next season.
The project involved providing a large birdcage inside the stand providing access and fall protection for when the roof sheeting was removed and replaced and to provide a bridge access scaffold to the street elevation to allow access along the roof edge. This was particularly challenging due to the many low level structures outside the stand with few places to support from ground this simple bridged elevation had spans of over 20m for which we employed the 1330mm deep alloy beams which enabled us to achieve the large spans whilst not disturbing any of the structures below.