July- November 2019

Previously the offices for Bloomburg, the 1930s built headquarters building was to undergo a major refurbishment. We were involved with the enabling demolition and strip out contract in preparation for the main contract to start.

Many different scaffolds were involved in this stage of the project including a cantilevered access scaffold along the Finsbury Square elevation which was supported at fifth floor level and extended up to roof level (see photos below). One of the more challenging designs in this project was a heavy duty crash deck spanning 15m within the basement area. The large span was achieved by using Asterix HD aluminium beams. Additionally, the crash deck was utilized to support a full height perimeter access scaffold enabling the formation of the new core area within the building.

Scaffolding erected By Aerial Scaffolding Limited